Operations CXO Status Report

Wednesday 5/10/00 12:00pm EDT

During last week the observing schedule was replanned to include two observations of the target XTE J1550-564 which was accepted as a Target Of Opportunity (TOO) on 4/30 following a major X-ray flux increase detected by the ASM of RXTE. The revised schedule from May 3 on:
 
---------------------------------------------
XTE J1550-564 TOO      ACIS-S/HETG     May 3
Radiation Belts        None
CL 0848.6+4453         ACIS-I          May 4
NGC 4261               ACIS-S          May 5
XTE J1550-564 TOO      ACIS-S/HETG     May 6
Radiation Belts        None
SN 1993J               ACIS-S          May 7
M82                    ACIS-I
Proxima Centauri       ACIS-S/HETG
Abell 1995             ACIS-S          May 8
---------------------------------------------
An anomaly related to the High Energy Transmission Grating (HETG) was detected on 5/8 after the grating did not insert when commanded by the daily load. Telemetry from the previous retraction on 5/6 showed that the grating had retracted but had not triped a limit switch near the end of travel. The limit switch changes the state of a bi-level flag that is checked during the software start-up prior to any insertion. If the flag is not set to "retract" the software will not insert the HETG. The data and event time-line point to a faulty A-side limit switch as the cause.

Real-time procedures were run at 1pm EDT 5/8 and 6.30pm EDT 5/9 to collect additional A-side data and to verify that the B-side electronics and limit switch function as expected. The daily load for the remainder of the week was replanned to include imaging observations only, and uplinked to the spacecraft at 6.30pm EDT 5/9. An additional test is planned to complete B-side checkout before resuming HETG observations from the daily load. Work has begun to develop an approach to restore A-side redundancy, e.g., by using potentiometer data in place of the limit-switch state to signal the HETG retraction state.

Real-time procedures were also run on 5/1/00 to perform the third ACIS squeegee mode test, and on 5/4/00 to perform a routine Ephemeris Coefficient Update.

All spacecraft subsystems, with the exception of HETG as above, continued to operate nominally.

Return to 2000 Status Reports


separator line
CXC Home | Search | Help | Site Map | Image Use Policy | Privacy & Accessibility | Downloads & Plugins
Latest Images | New & Noteworthy | Multimedia | Flash Ecards | Glossary | Q&A | Guestbook


RSS Feed RSS Feed | Podcast Podcast | Blog Blog

[News by email: Chandra Digest]
[Press Email cxcpress@cfa.harvard.edu]
[Public Email: cxcpub@cfa.harvard.edu]
NASA's Home Page Smithsonian's Home Page CXC Home Page Image Map for NASA's, Smithsonian and Chandra's Home Pages
Harvard-Smithsonian Center for Astrophysics
60 Garden Street, Cambridge, MA 02138 USA
Phone: 617.496.7941 Fax: 617.495.7356


Text Size:
normal font large font larger font
Chandra X-ray Center, Operated for NASA by the Smithsonian Astrophysical Observatory
This site was developed with funding from NASA under Contract NAS8-03060.
Revised: August 29, 2006