Friday 15 September 2006 7.30am EDT
During the last week Chandra completed the observing schedule as
planned.
A realtime procedure was completed on September 14 to update the on-board Ephemeris. The schedule of targets for next week is shown below and includes a series of 42 calibration observations of the target AR Lac and an observation of 1E 1048.1-5937 coordinated with HST. |
------------------------------------------
Radiation Belts Sep 16
1H 1905+000 ACIS-S Sep 17
M33 Field 5 ACIS-I
SAX J1818.6-1703 ACIS-S Sep 19
1H 1905+000 ACIS-S
Radiation Belts
1H 1905+000 ACIS-S Sep 20
AR Lac (21 obs) HRC-I
RXC J1134.8+4903 ACIS-S Sep 21
AR Lac (21 obs) HRC-S
Radiation Belts Sep 22
1H 1905+000 ACIS-S
P8 ACIS-I Sep 23
1E 1048.1-5937 ACIS-S
RCW36 ACIS-I
P7 ACIS-I Sep 24
M31 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.