News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chandra Mobile
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 7 June 2007 8.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Jun 6 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes a time-constrained observation of RXJ1131-1231.

------------------------------------------
Radiation Belts                     Jun 11
RXJ1131-1231           ACIS-S
NGC 6826               ACIS-S
NGC5846                ACIS-I       Jun 12
A2218                  ACIS-I       Jun 13
A2125                  ACIS-I
NGC 2082               ACIS-S
Abell 3266             ACIS-I
AX J162246-4946        ACIS-S
Radiation Belts
Abell 2744             ACIS-I       Jun 14
AX J184400-0355        ACIS-S
NGC 6826               ACIS-S
Rabbit                 ACIS-I
IC 5063                ACIS-S       Jun 15
Radiation Belts                     Jun 16
LHA 120-N 11           ACIS-I
NGC 2139               ACIS-S       Jun 17

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports