News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chandra Mobile
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 4 April 2008 8.30am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Apr 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A second procedure was completed on Apr 2 to reinitialize the flight software Thruster Command Processing subfunction to clear a benign overflow condition.

The schedule of targets for the next week is shown below.

------------------------------------------
Abell 1201             ACIS-I       Apr 7
3C133                  ACIS-S       Apr 8
MWC 480                ACIS-S
3C305                  ACIS-S
Radiation Belts
1RXS J141256.0+792     ACIS-S
Cepheus A              ACIS-I       Apr 9
NGC 7089               ACIS-S       Apr 10
S29                    ACIS-S
RXCJ1558.3-1410        ACIS-S
Radiation Belts
NGC 2915               ACIS-S       Apr 11
NGC3923                ACIS-S
RXCJ0638.7-5358        ACIS-I       Apr 12
S33                    ACIS-S       Apr 13
HCG 59                 ACIS-S
Radiation Belts
3C 288                 ACIS-S       Apr 14

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports