News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chandra Mobile
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Tuesday 5 October 1999 9.00am EST

During the last 24 hours Chandra completed a series of calibration measurements of AR Lac with the HRC, and completed a pre-radiation belt ACIS CTI measurement. The HRC door was partially closed in preparation for belt passage. The spacecraft entered the belts at 7.30AM 10/5 and will enter the 8th eclipse of the season at 11:15AM 10/5. The eclipse will last 58 minutes.

Following belt exit at 6.45PM 10/5 an ACIS CTI measurement will be conducted then a long (145 Ks) observation of SN1987A with ACIS-S and the High Energy Transmission Grating. This GTO observation will run throughout the next orbit.

The spacecraft systems continued to operate nominally.





Return to Status Reports