News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chandra Mobile
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 6 June 2008 8.00am EDT

During the last week Chandra completed the observing schedule as planned.

A failure of the T1 network link between the OCC and JPL/DSN on Jun 4 resulted in two missed passes and a roll-over to the B-side SSR. Communication was restored and all data successfully dumped before the B-side recorder filled. Real-time data were acquired by DSN during each of the missed passes and transferred to the OCC via a separate slow-speed link so state of health could be assessed.

A real-time procedure was executed on Jun 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

A Chandra image release was issued on Jun 2 of the mixed morphology supernova remnant, W28. The composite image shows particles that have been superheated in X-rays and an inner region enclosed by shell structure detected in radio emission. For details see: http://chandra.harvard.edu/photo/2008/w28/

The schedule of targets for the next week is shown below and includes an observation of CH Cyg coordinated with HST and NRAO radio telescopes.

------------------------------------------
GS 1839-06             HRC-I        Jun 9
CH Cyg                 ACIS-S
NGC1399                ACIS-S
AX J165105-4403        ACIS-S       Jun 10
NGC 6652               ACIS-S
NGC 6611               ACIS-I
HD157999               HRC-I
CH Cyg                 ACIS-S
Radiation Belts
AEGIS-1                ACIS-I       Jun 11
CH Cyg                 ACIS-S
PSR J1852+0040         ACIS-S
HD157999               HRC-I        Jun 12
AEGIS-1                ACIS-I
MACS1427-25            ACIS-I
AEGIS-1                ACIS-I       Jun 13
Radiation Belts
AEGIS-1                ACIS-I       Jun 14
ESO 137-001            ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports