News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chandra Mobile
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 2 July 2010 9.00am EDT

During the last week the observing schedule was replanned to include observations of GRB100628 and Cir X-1 that were accepted as a Target of Opportunity on June 28 and 29 respectively. The replacement loads were uplinked on June 30. Planned observations of PGC1206166, SDSS J135920.99+5137, and SPT-CL 0552-5709 were impacted and will be rescheduled at a later date.

A Chandra image release was issued on June 30 of CID-42, an unusual object discovered in the Cosmic Evolution Survey. By combining data from Chandra and other telescopes, evidence is found for a recoiling black hole in the system. For details see: http://chandra.harvard.edu/photo/2010/cid42/

The schedule of targets for the next week is shown below

------------------------------------------
HE0435-1223            ACIS-S       Jul  4
ChandraDeepField-S     ACIS-I       Jul  5
A1319                  ACIS-S
SBS1129+576            ACIS-S       Jul  6
Radiation Belts
AXJ183356-0822         ACIS-S
NGC6304                ACIS-I
PKS1934-63             ACIS-S       Jul  8
VelaPWN                ACIS-S
RXJ033340.22-391833.   ACIS-S
Radiation Belts                     Jul  9
ChandraDeepField-S     ACIS-I
PGC042596              ACIS-S       Jul 10
MKN421 (2 obs)         ACIS-S/LETG
MKN421                 HRC-S/LETG
Markarian231           ACIS-S       Jul 11
ChandraDeepField-S     ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports