News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chandra Mobile
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 7 January 2011 9.00am EST

During the last two weeks Chandra completed the observing schedule as planned.

A real-time procedure was executed on Jan 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A second real-time procedure was completed on Jan 6 to update the on-board ephemeris.

The schedule of targets for the next week is shown below

------------------------------------------
         Radiation Belts                     Jan 10
         SPT-CL0324-6236        ACIS-I
         ESO137-002             ACIS-S
         SDSSJ145828.64+01323   ACIS-S       Jan 11
         PGC1223766             ACIS-S       Jan 12
         SDSSJ0945+1009         ACIS-S
         GZ_merger_AGN_4        ACIS-I
         1624+049               ACIS-S
         A2457                  ACIS-I
         SPT-CL0324-6236        ACIS-I
         Radiation Belts
         M31                    ACIS-I       Jan 13
         BlancoCosmological     ACIS-S
         A2204_Field4           ACIS-I
         LeoT                   ACIS-S
         0907+049               ACIS-S       Jan 14
         RMCPL1                 ACIS-I
         BlancoCosmological     ACIS-S
         Crab                   ACIS-S
         XMMUJ0954+1738         ACIS-S       Jan 15
         Radiation Belts
         BlancoCosmological     ACIS-S
         NGC1589-OT             ACIS-S       Jan 16
         IRAS05589+2828         ACIS-S
         XMMUJ0954+1738         ACIS-S
         1FGLJ1511.9-2253       ACIS-I       Jan 17
         BlancoCosmological     ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports