News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chandra Mobile
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 6 January 2012 9.00am EST

During the last two weeks Chandra completed the observing schedule as planned.

A real-time procedure was executed on Dec 31 to re-initialize the flight software Thruster Command Processing subfunction in order to prevent the occurrence of an overflow condition. A second real-time procedure was executed on Jan 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A third real-time procedure was executed on Jan 5 to update the on-board ephemeris.

The schedule of targets for the next week is shown below and includes an observation of SN2011ja, which was accepted as a Target of Opportunity on Dec 27, an observation of PTF11qcj, which was accepted as a Director's Discretionary Time TOO on Dec 27, and an observation of UZTauE_P1 coordinated with OVRO/CARMA.



------------------------------------------
SDSSJ1558-0031         ACIS-S       Jan  8
         IC2497                 ACIS-S
         Mrk3                   ACIS-S       Jan  9
         HZ43                   HRC-S/LETG
         SDSSJ1543+3359         ACIS-S
         Q2237+0305             ACIS-S
         Radiation Belts                     Jan 10
         SN2011ja               ACIS-S
         HD134987               ACIS-S
         IC2497                 ACIS-S
         SDSSJ095948.59+3449    ACIS-S       Jan 11
         SDSSJ1150+2819         ACIS-S
         2MASXJ09043699+5536    ACIS-S
         Crab                   ACIS-S       Jan 12
         UZTauE_P1              ACIS-S
         E0102-72S3             ACIS-S
         E0102-72S2             ACIS-S
         A2204_Field1           ACIS-I
         Radiation Belts
         PTF11qcj               ACIS-S       Jan 13
         PSS0926+3055           ACIS-S
         2QZClus1004+00         ACIS-I
         G228.49+53.12          ACIS-I       Jan 14
         E0102-72I3             ACIS-I
         SPT-CLJ0151-5954       ACIS-I
         E0102-72S1             ACIS-S       Jan 15

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports