Friday 11 February 2005 11.00am EST
During the last week loads were replaned to ensure proper thermal
constraints for a propulsion line following a yellow limit violation
on 6 Feb. As a result of the replan, the order of targets DLS
J0514-4904 and 1249+3038 was changed to ensure a favorable temperature
profile.
The schedule of targets for the next week is shown below and includes a DDT observation of PSR J0437-4715. |
------------------------------------------
NGC 3690 ACIS-S Feb 13
1ES 1239+069 HRC-I Feb 14
RX J1308.8+2127 ACIS-S
M87 ACIS-S
Radiation Belts
RX J1308.8+2127 ACIS-S Feb 15
Cygnus A ACIS-I
cl1003+3253 ACIS-I
cl1117+1744 ACIS-I Feb 16
Cygnus A ACIS-I
Radiation Belts Feb 17
RX J0806.4-4123 ACIS-I Feb 18
PSR J0437-4715 ACIS-S
2MASS 194915-55101 ACIS-S
SDSS J101627.32-00 ACIS-S
RXCJ1213.3-2617 ACIS-S
RX J1308.8+2127 ACIS-S
Cygnus A ACIS-I Feb 19
cl0958+4702 ACIS-I
cl0853+5759 ACIS-I
Radiation Belts
HZ43 HRC-I/LETG Feb 20
Vega ACIS-I
Vega ACIS-S
Vega HRC-I
Vega (4 obs) HRC-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.