News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chandra Mobile
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 1 April 2005 9.00am EST

During the last week Chandra completed the observing schedule as planned.

Of note this week was the completion of a 2 day safemode recovery training simulation held during 28-29 March. The operations team efficiently identified the cause of the simulated safemode and completed a nominal recovery to normal operations mode.

The schedule of targets for the next week is shown below.

------------------------------------------
SDSS J101018.19+00     ACIS-S       Apr 3
Crab Nebula (3 obs)    ACIS-S/HETG  Apr 4
V710 Tau               ACIS-S
Maffei 1               ACIS-S
cl0333-2456            ACIS-I       Apr 5
MACSJ2219.1-1844       ACIS-I
Radiation Belts
EGS-4                  ACIS-I       Apr 6
Abell 1569             ACIS-I       Apr 7
EGS-4                  ACIS-I
cl1312+3900            ACIS-I       Apr 8
Radiation Belts
G299.2-2.9             ACIS-S       Apr 9
2MASS 031159-46554     ACIS-S
HD 204867              HRC-I
MACSJ1542.0-2915       ACIS-I       Apr 10
PSR J1537+1155         ACIS-S
AX J1426.9+2334        ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports