News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 2 October 2020 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Real time procedures were run Monday evening to perform a controlled ramp-up of the HRC-I microchannel plate high voltage. The HRC microchannel plate was slowly ramped up to same values as used by the A side electronics. A live image was accumulated and AR Lac was easily seen with approximately the expected count rate. Detailed analysis is being performed. Additional real-time procedures were executed during each ground contact to reset the DSN Outage Dead Man Load.

The schedule of targets for the next week is shown below and includes an observation of A0620-00 coordinated with VLA and NOAO/LCO, and observations of NGC 205 coordinated with VLA.



------------------------------------------
        MRC 0131-449           ACIS-S
        GJ 358                 ACIS-S       Oct  5
        SDSSJ0050-0212         ACIS-S      
        SNR 0509-67.5.         ACIS-S  
        Radiation Belts                     Oct  6
        J101815.1+462623.9     ACIS-S
        NGC 205                ACIS-S  
        RBS 797                ACIS-S       Oct  7
        NGC 205                ACIS-S  
        RBS 797                ACIS-S  
        SDSSJ0047+2640         ACIS-S       Oct  8
        Radiation Belts
        Westerlund 1           ACIS-I       Oct  9
        Orion Nebula Cluster   ACIS-S/HETG
        2MASS 0201+0117AB      ACIS-S       Oct 10
        A0620-00               ACIS-S  
        4FGL J0744.0-2525      ACIS-I
        DSSJ014721.7-091646    ACIS-S          
        MCG -5-23-16           ACIS-S/HETG          
        Radiation Belts                     Oct 11

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports