News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 9 October 2020 9.00am EDT

During the last week the observing schedule was replanned to incorporate an observation of GRB201006A, which was accepted as a Target of Opportunity on Oct 7. Loads for the replanned schedule were uplinked on Oct 9. Scheduled observations of Westerlund1 and Orion Nebula Cluster were impacted by the replan and will be rescheduled in a future week.

Real-time procedures were executed on Oct 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE).

Real-time procedures were executed during each ground contact to reset the DSN Outage Dead Man Load.

The schedule of targets for the next week, with a planned start of Oct 12, is still in work.





All spacecraft subsystems continued to support nominal operations.