Friday 11 March 2022 9.00am EST
During the last week the observing schedule was replanned to adjust the roll angle of one target to accommodate an update to the off-nominal roll pointing constraint. No scheduled observations were impacted. A real-time activity was executed on Mar 11 to power on the HRC B-side electronics to collect diagnostic information on the electronics. Following the data collection activity the HRC was returned to a powered-off state. The schedule of targets for the next week is shown below and includes observations of SDSS J143016.05+230344.4, which are follow-ups to a Director's Discretionary Time Target of Opportunity accepted on Feb 7, and an observation of AT2018hyz, which was accepted as a Director's Discretionary Time Target of Opportunity on Feb 24.  | 
------------------------------------------
        Radiation Belts                     Mar 13
        SDSSJ143016.05+2303    ACIS-S
        GW170817               ACIS-S
        E0102-72.3             ACIS-S
        PKS1136-135            ACIS-S
        SPT-CLJ2316-5027       ACIS-I       Mar 15
        PKS1136-135            ACIS-S
        CrabNebula             ACIS-S
        PG1115+080             ACIS-S
        JWST-DTDF-1            ACIS-I
        SDSSJ143016.05+2303    ACIS-S       Mar 16
        PG1115+080             ACIS-S
        Radiation Belts
        SDSSJ143016.05+2303    ACIS-S
        JWST-DTDF-1            ACIS-I
        SDSSJ130134.10+03561   ACIS-S       Mar 17
        GDHIdp59               ACIS-I
        GDHIdp59               ACIS-I
        GDHIdp59               ACIS-I
        GDHIdp59               ACIS-I
        GDHIdp59               ACIS-I
        GDHIdp59               ACIS-I
        GW170817               ACIS-S
        E0102-72.3             ACIS-S       Mar 18
        NGC3258                ACIS-I
        GDHIdp64               ACIS-I
        Radiation Belts                     Mar 19
        AT2018hyz              ACIS-S
        ZTFJ0127+5258          ACIS-I
        MOOJ1046+2758          ACIS-I
        SgrA*                  ACIS-S       Mar 20
        NGC3258                ACIS-I------------------------------------------
All spacecraft subsystems except HRC continued to support nominal operations.
Return to Status Reports