Friday 8 August 2025 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Aug 6 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). Chandra passed through the 2nd, 3rd, and 4th eclipses of the season on Aug 2, 4, and 7 respectively, with nominal power and thermal performance. The schedule of targets for the next week is shown below and includes an observation of EP250630b, which was accepted as a Director's Discretionary Time Target of Opportunity on Aug 5, an observation of EXO 0748-676, which is a follow-up to a Target of Opportunity which was accepted on Apr 29, and an observation of Sgr A* coordinated with JWST. |
------------------------------------------
Abell370 ACIS-I Aug 10
NGC7314 ACIS-S/HETG Aug 11
PSZ2G047.73-60.15 ACIS-I
EXO0748-676 ACIS-S
70OPH HRC-I
SgrA* ACIS-S
HE1353-1917 HRC-I Aug 12
LAMOSTJ215015.75+05 ACIS-S
Radiation Belts Aug 13
GW170817 ACIS-S
EP250630b HRC-I
PSZ2G200.63-64.71 ACIS-I
NGC7314 ACIS-S/HETG
HE1353-1917 HRC-I
WISEJ025942.86-1635 ACIS-S Aug 14
SPT-CLJ2305-2248 ACIS-I
HE1353-1917 HRC-I
Abell3017 ACIS-S
Radiation Belts Aug 15
SPT-CLJ2305-2248 ACIS-I
IC4709 ACIS-S Aug 16
GAMA238411 ACIS-S
2RXSJ205841.2-14291 ACIS-S
SDSSJ142819.32+1525 ACIS-S
Abell370 ACIS-I
SDSSJ223025.08-09204 ACIS-S Aug 17
GaiaDR233219439712 ACIS-S
Abell370 ACIS-I
Radiation Belts------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

