Friday 6 March 2026 9.00am EST
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Mar 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). A real-time procedure was executed on Mar 6 to test HRC-S operational stability. Observations with the HRC-S detector have been suspended since the HRC-S High-Voltage anomaly on Oct 23, 2025. The schedule of targets for the next week is shown below, and includes an observation of AT2026dbl, which is a follow-up to a Target of Opportunity accepted on Feb 20, and is coordinated with NuStar, and an observation of GS 1354-64, which is a follow-up to a Target of Opportunity, which was accepted on Jan 30 and is coordinated with NuSTAR, Gemini, JVLA, and NICER. |
------------------------------------------
Radiation Belts Mar 8
GS1354-64 ACIS-S/HETG
UGC06457 ACIS-I Mar 9
GALEXASCJ211218.07- ACIS-S
Radiation Belts
PerseusclusterN ACIS-I Mar 10
SDSSJ105432.03+1228 ACIS-S
PerseusclusterN ACIS-I
AT2026dbl ACIS-S
GaiaDR233081522084 ACIS-S Mar 11
SNR1987A ACIS-S/HETG
SNR1987A ACIS-S/HETG
SDSSJ105432.03+1228 ACIS-S
Radiation Belts Mar 12
SDSSJ105432.03+1228 ACIS-S
PerseusclusterW ACIS-I
SDSSJ105432.03+1228 ACIS-S Mar 13
PerseusclusterW ACIS-I
SDSSJ110540.09+06422 ACIS-S
PerseusclusterS ACIS-I
Mrk732_s1 ACIS-S
PerseusclusterS ACIS-I
Mrk732 ACIS-S Mar 14
PerseusclusterE ACIS-I
IC0678 ACIS-I
PerseusclusterE ACIS-I
CloverleafORC ACIS-I
Radiation Belts Mar 15
CloverleafORC ACIS-I
PerseusclusterE ACIS-I
PerseusclusterE ACIS-I
CloverleafORC ACIS-I------------------------------------------
All spacecraft subsystems except HRC-S continued to support nominal operations.
Return to Status Reports

