| During the last two weeks Chandra completed the observing schedule as planned.
A real-time procedure was executed on Jan 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A second real-time procedure was completed on Jan 6 to update the on-board ephemeris. The schedule of targets for the next week is shown below |
------------------------------------------
Radiation Belts Jan 10
SPT-CL0324-6236 ACIS-I
ESO137-002 ACIS-S
SDSSJ145828.64+01323 ACIS-S Jan 11
PGC1223766 ACIS-S Jan 12
SDSSJ0945+1009 ACIS-S
GZ_merger_AGN_4 ACIS-I
1624+049 ACIS-S
A2457 ACIS-I
SPT-CL0324-6236 ACIS-I
Radiation Belts
M31 ACIS-I Jan 13
BlancoCosmological ACIS-S
A2204_Field4 ACIS-I
LeoT ACIS-S
0907+049 ACIS-S Jan 14
RMCPL1 ACIS-I
BlancoCosmological ACIS-S
Crab ACIS-S
XMMUJ0954+1738 ACIS-S Jan 15
Radiation Belts
BlancoCosmological ACIS-S
NGC1589-OT ACIS-S Jan 16
IRAS05589+2828 ACIS-S
XMMUJ0954+1738 ACIS-S
1FGLJ1511.9-2253 ACIS-I Jan 17
BlancoCosmological ACIS-S------------------------------------------
All spacecraft subsystems continued to support nominal operations.